Is there any possible way to copy schedules so that I do not have to do all of this by hand over and over?? This is very frustrating. We run three concurrent schedules so I already created those. We also have six cycle days (I was able to copy those, thank you). But to add modified schedules I have to do each one by hand? That would mean that for the five potential modified schedules we run in a year, I would need to enter each one on every cycle day of every concurrent schedule? Meaning I would need to enter 90 different schedules by hand (5 modified schedules x 3 concurrent schedules x 6 cycle days). That’s a bit insane. I should be able to create like a template schedule to pull and use over and over or the copy feature should be available throughout the scheduler tool and not just in the cycle days.